Getting the saw ready to cut the plywood for the center section bottom.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Center section plywood bottom.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Checking the depth of the 1" x 1/16 channel that receives the plywood skin.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Plans cut out and glued to the plywood.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Center Section
Viewed: 2297 times.
Getting the saw ready to cut the plywood for the center section bottom.
Viewed: 2026 times.
Center section plywood bottom.
Viewed: 2075 times.
Checking the depth of the 1" x 1/16 channel that receives the plywood skin.
Viewed: 2021 times.
Plans cut out and glued to the plywood.
Viewed: 1936 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I used cap strip pieces held on with thumb tacks to help guide the router.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
End result before removing the cap strip guides.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
All the center section false ribs. I forgot to cut the trailing edge slots in the longest two trailing edge ribs.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I cut out the end rib plan and glued it to the plywood. I then tacked both ribs together so that they will be identical.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Again I used cap strips when possible to guide the router.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
I used cap strip pieces held on with thumb tacks to help guide the router.
Viewed: 1967 times.
End result before removing the cap strip guides.
Viewed: 1979 times.
All the center section false ribs. I forgot to cut the trailing edge slots in the longest two trailing edge ribs.
Viewed: 1979 times.
I cut out the end rib plan and glued it to the plywood. I then tacked both ribs together so that they will be identical.
Viewed: 2114 times.
Again I used cap strips when possible to guide the router.
Viewed: 2101 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Getting ready to transfer the edge of the end rib to the spar. It turned out to be a 10 degree angle. I did it this way because the dimension for the spar height is incorrect on the plans.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
All the pieces being trial fit. I think it looks pretty good.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Rib construction on one side, center section on the other.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Time to start on the trailing edge bow.
I started with 3 x 1 x 6 ft. and cut them in half on the table saw.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I then planed each piece down to 1/8 inch thick.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
Getting ready to transfer the edge of the end rib to the spar. It turned out to be a 10 degree angle. I did it this way because the dimension for the spar height is incorrect on the plans.
Viewed: 2113 times.
All the pieces being trial fit. I think it looks pretty good.
Viewed: 1950 times.
Rib construction on one side, center section on the other.
Viewed: 2071 times.
Time to start on the trailing edge bow.
I started with 3 x 1 x 6 ft. and cut them in half on the table saw.
Viewed: 1991 times.
I then planed each piece down to 1/8 inch thick.
Viewed: 2037 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
When I was done I had 6 pieces that were 1/8 inch thick and about 10 inches to long.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I made a box from insulation foam board that was big enough to put the wood in. I glued it together with Gorilla glue.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I used rubber bands to hold strips between the wood so that the steam could circulate.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I hooked the steam box up to a tea kettle with a piece of Tygon tubing clamped to the kettle. The other end was to a barbed fitting that was pressed into the foam.
I left it going for about 2 hours. I was surprised that I had good steam flowing through the box and my thermometer was pegged at over 200 degrees.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I had traced the bow onto the bench and then nailed right angle supports at each rib location. I clamped the steamed strips for three days to make sure that they were dry and then I epoxied them together and re-clamped them.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
When I was done I had 6 pieces that were 1/8 inch thick and about 10 inches to long.
Viewed: 2057 times.
I made a box from insulation foam board that was big enough to put the wood in. I glued it together with Gorilla glue.
Viewed: 1983 times.
I used rubber bands to hold strips between the wood so that the steam could circulate.
Viewed: 2005 times.
I hooked the steam box up to a tea kettle with a piece of Tygon tubing clamped to the kettle. The other end was to a barbed fitting that was pressed into the foam.
I left it going for about 2 hours. I was surprised that I had good steam flowing through the box and my thermometer was pegged at over 200 degrees.
Viewed: 2136 times.
I had traced the bow onto the bench and then nailed right angle supports at each rib location. I clamped the steamed strips for three days to make sure that they were dry and then I epoxied them together and re-clamped them.
Viewed: 2081 times.
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I used two of the ribs to set the space between the spars. I then made some 2x4 spacers so that I could clamp it all together.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
So far so good. I thought the bow came out great. It still needs to be shaped.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Clamping the doublers to the spars. Although it looks like a lot of clamps they are not very tight. I don't want to squeeze out all the glue, just keep them flat.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
Center section wing mounts after being water jet cut
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
FRAME
FRAME
FRAME
I had all the holes water jet cut to .290 then I bolted them together, drilled them to 9/32 and then reamed them to 5/16. I was very pleased with the result.
FRAME
FRAME
FRAME
FRAME
FRAME FRAME FRAME
FRAME
I used two of the ribs to set the space between the spars. I then made some 2x4 spacers so that I could clamp it all together.
Viewed: 2009 times.
So far so good. I thought the bow came out great. It still needs to be shaped.
Viewed: 2106 times.
Clamping the doublers to the spars. Although it looks like a lot of clamps they are not very tight. I don't want to squeeze out all the glue, just keep them flat.
Viewed: 1964 times.
Center section wing mounts after being water jet cut
Viewed: 1989 times.
I had all the holes water jet cut to .290 then I bolted them together, drilled them to 9/32 and then reamed them to 5/16. I was very pleased with the result.